Hi All, See below my notes on our Friday meeting.  I've also added them to my Fast Feedback meeting minutes list in Confluence, at Thanks,

Diane ATTENDEES ATTENDEES:

Sheng, Qing, Chris, Matt, Rick, Diane TOPICSDiane

TOPICS:

30,  60Hz and 120Hz BLD

The current e-beam BLD is limited to providing data at most 30Hz. In May LCLS will likely not run at 120Hz, but may be able to provide 60Hz beam rate.   It was generally agreed that if 60Hz beam rate is available then experimenters will want it.

It was also generally agreed that BLD data needs to be available at beam rate. IN May the feedbacks that were supposed to supply the e-beam energy and position data at 120Hz will not have been commissioned - mostly likely they will not be running until July. This means the BLD must continue to do a rough calculation of those parameters, but must be able to do this at 60Hz.  BLD   

BLD Design

The e-beam BLD IOC will required three network interfaces instead of the expected two interfaces. They are 1) to the LCLSFNET e-beam multicast network to receive 120Hz data, 2) to the LCLSCA e-beam channel access network to receive coefficients for the rough calculations and 3) to the PCSD multicast network to send the results. I have learned from Till Straumann that we do have a recommended PMC card and RTEMS driver to supply the 3rd network interface needed.   The e-beam group will estimate the effort and schedule to add the new interface and let you know when we can have a 60Hz/120Hz BLD ready. Errors  

Errors with the current BLD

The current BLD drops a pulse (once every 10 second at most) and reports the same pulse id twice. We expect this problem to go away when the BLD is integrated with FCOM and receives its data from the e-beam fast network. ACTION  

ACTION ITEMS:

Qing - estimate time and effort needed to add 3rd NIC to BLD and complete the integration with FCOM.