  • Questions
    • It is not clear what the test script should do if one of the prerequisite/verification tests fails. Should it immediately abort the test or should it run all the prerequisite/verification steps and if at least one of them failed then abort the test?
    • Another uncertainty is where we need to set the SIU/DAQ paths (cross-strapping). That is where do we need to call vsc.siuSelect(...) and vsc.daqSelect(...) which sets the AA, AB,... etc. redundant or primary paths? Should this come from some sort of schema/configuration file?
    • Right now for the testbed SIU feed voltage, DAQ feed voltage and current delta requires the manual task of checking these measurements by looking at the panel, are these going to be provided as telemetry eventually?
    • Rich Bialewski indicates that the logical SIU unit id is always 0. Is this accurate?
    • When checking SIU and EPU boot telemetry we verify that we are in boot code mode (BOOT_MODE_COMMAND) is this accurate?
    • Do we test VCHP functionality on the ground (see SIU Control of TCS in the LAT start up document)? If so how?
    • Steps 8 and 10 of the LAT start up document has have this as a verification steptest: EPU-x HK telemetry is present. How do we get this telemetry?