Attendees: Leinani, Elena,Josh, Rebecca, Armin, Dennis, Eliazar, Abigail, Connor, Mitchell, Maggie, Patrick
Announcements:
- Rebecca out June 26-July9
Discussion:
- Mirror Substrates TPRR - received report - updating drawings and ESDs- aiming to complete by end of week
- procurements -
- Req started for substrates - started
- ASP started
- Req started for substrates - started
- Eliazar will approve on Armin's behalf
- procurements -
- Laser Transport EPR - report received from Brice
- FEH configuration updates
- list of options? still waiting
- A/E feedback - october?
- laser needs for IP1, IP3 in CXI - september?
- 400W baseline- Matthias Kling - first stab by end of this week?
- decisions and path forward on September timeframe
- FEH configuration updates
- Lasers PDR - Week of July 15? maybe late July?
- ESD progress taking some resource efforts away from pdr prep
- meeting tomorrow-
- Doc preparation
- Slides being prepared
- ESD progress taking some resource efforts away from pdr prep
- Controls
- looking at documentation
- review on wednesday?
- see if components fit on stands?
- Infrastructure -
- Met with Hannah - Control Room RDS
- Hannah is also developing mezzanine RDS - looking at loading in the FEH
- MFX RDS will be ready for interim release once we update rack items
- House Nitrogen - should we consider in present RDS? even though implementation is far in the future?
- control room RDS - not in project scope but we should provide feedback: https://slac.sharepoint.com/:w:/r/sites/lcls/lcls-2-he/exp/shared_docs/Experimental%20Systems/MFX/FEH%20Reconfiguration/FEH%20Hutch%204.5%20MFX%20Control%20Room_RDS%20%5B69%5D.docx?d=w82778d072cc34bf8a25fe887fbfbdc59&csf=1&web=1&e=JWrwbF
- rackspace - Mitchell met with Omar(IT/Data), Matt(BCS), (PPS) - follow ups next week? stakeholders needing space first
- BCS needs to confirm space requirements
- Handed off information/presentation to Diling
- will need to look out for the mezzanine RDS - will need to add penetrations? power requirements? we'll need to touch base with Hannah
- Mechanical -
- Infrastructure
- RDS updates
- rack layout
- Elena working through collimator supports
- CXi is adding a collimator next to PC2L5, PC2L4
- BTm connectors interfering?
- Design of shielding in hutch 4 - waiting for final requirements but basic design near completion
- IM2L5 - location
- needs a stand name
- developing 2D drawings- working with Igor
- BIO seismic
- IM2L5 - location
- BCS sensor counts - looking at gate valve ties, etc
- need to look at diffraction issues in the hutch
- Mirror- is there a published note? MFX specific? Will will generate? Or edit DXS note?
- redundant sensors?
- need to update note
- need to look at diffraction issues in the hutch
- Diffraction - start building a note like in XPP?
- XPP style Side boards would work for lasers?
- re-do BIO
- ejection and ATM
- Mechanical team will engineer these systems (jim charge laser number?)/ Laser team will assist with analysis
- MODS table location updated
- final design for structure still in the works
- Components to be added to tables
- Infrastructure