Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  •  Turn of XPS controller
  •  Bring detector into tunnel
  •  Align detector on optical table (make notes!!!)
  •  Connect and test motor controller
  •  Define detectors parking position
  •  Connect and test power switches for darkening
  •  Place, connect, and test the arduino (above table?)
  •  Connect trigger, communication, and signal cables
  •  E320 patch panel has common ground?
  •  Measure motor position for being in the beam
  •  Measure distance beam window to straws/rotational axis 
  •  Set up trigger delays
  •  Test setup with LED
  •  Selfie with detector
  •  Foto Arduino front panel
  •  One fiber calibration
  •  LED Voltage/SiPM gain scan
  •  fight for PP-06 J16 and Spencers channel

Post-PAMM (Pre-Beamtime)

  •  Write EPICS / CAEN communication
  •  Create runlist planning
  •  Test CAEN saving on stop
  •  Test CAEN saving every N event
  •  Create main control script
  •  Extend quickDraw script
  •  Tidy up computer, put everything in one directory
  •  ctrl-C proper disconnect
  •  Update trigger scheme
  •   

...