Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Current Involvements:

  • Upgrade tracker layout studies.
  • Cavern background.
  • Pile-up validation.
  • Optimization of Geant4 simulation.

past Projects:

  • Parameterized shower.
  • Muon detector description.