...
...
- Write EPICS / CAEN communication
- Create runlist planning
- Test CAEN saving on stop
- Test CAEN saving every N event
- Create main control script
- Extend quickDraw script
- Tidy up computer, put everything in one directory
- ctrl-C proper disconnect
- Update trigger scheme
Measurements
Move-in procedure
- SiPM bias at 0 V
- Motor homing (0, 0, 0), out of beam
- Check the dipole spectrometer setting
- Park beam at TD11
- Move:
- x = 194
- y = 114
- r = 27