MD Item | Procedure Link | Machine Time | Responsible Party | Required beam destination | Notes | Completed |
---|---|---|---|---|---|---|
DL10 energy minimization vs bunch charge | E-log | Ops | TD11 | Can be done with optimized injector emittances, variable Schottky phase | 2/13/24 Unoptimized SOL121 | |
Injector bunch length vs bunch charge | Ops | TD11 | Can be done with optimized injector emittances, variably Schottky phase | |||
S20 beam density measurements | S20 beam density vs chrip | Ops | FACET dump | Repeat with upstream emittance measurements | ||
XTCAV calibration vs power | Verify that streaking calibration is the scales with power | |||||
Injector wire commissioning | Find wires, verify planes | |||||
Compare injector wire emittances to 571 quad scan | Sounds like the kind of task that will challenge your faith in our most reliable measurement | |||||
YOUR IDEAS HERE | Curious about something? Propose a study to get data about it! |
...