Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

MD ItemProcedure Link

Machine Time

Responsible Party

Required beam destination NotesCompleted
DL10 energy minimization vs bunch chargeE-log

Ops

TD11Can be done with optimized injector emittances, variable Schottky phase2/13/24 Unoptimized SOL121
Injector bunch length vs bunch charge



OpsTD11Can be done with optimized injector emittances, variably Schottky phase
S20 beam density measurementsS20 beam density vs chrip
OpsFACET dumpRepeat with upstream emittance measurements 
XTCAV calibration vs power 



Verify that streaking calibration is the scales with power 
YOUR IDEAS HERE



Curious about something? Propose a study to get data about it!

...