Priority | MD Item | Procedure Link | Machine Time (shifts) | Responsible Party | Needed By | Prerequisites | Notes | Complete | |
---|---|---|---|---|---|---|---|---|---|
3 | Injector setup for 10deg off Schottky zero crossing | 3 | White | TCAV0 operational | Maybe investigate smaller laser spot | ||||
3 | Laser spot size variation | Discussion with Glen... | |||||||
3 | Linac Ballistic Data | 5 | |||||||
3 | S20 Ballistic Data | Good pencil beam config | |||||||
3 | Individual mechanical<>magnetic offsets in L2 | Loney | |||||||
1 | 10-2 peak power | 1 | Kalsi, Loney | ASAP | Move peak power detection from WVG FWD to cavity probe | ||||
1 | S20 BBA | 2 | Yocky | ||||||
2-4 | Notch Collimator recommissioning | 1+2 | Current energy spread may not be compatible with clean cuts | ||||||
2 | S20 matching studies/emittance in S20 | 1 | White | Good pencil beam config, S20 Quad BBA, S20 launch feedback | |||||
3 | 2nC running/instability investigation | 2 | Loney | FJD interested | |||||
1 | Two-bunch prep/setup | 8 | Yocky* | Early 2024 | |||||
4 | BLEN sensitivities | BLEN Sensitivities MD | Alsberg | ||||||
2 | S20 BLEN | Kalsi | |||||||
2 | Investigate orbit dependent matching into L2 | White* | BBA, working steering app | FJD notes similar issue in LCLS–likely eta from BC1 | |||||
1 | Complete ORM | Loney | Analysis tools | Done? | |||||
2 | Tuning IP with smaller beta* | Yocky | |||||||
1 | Pencil beam config | Oct 13, 2022 | Alsberg | ||||||
3 | Learning data for MDL FF / Track hardware issues | Oct 6, 2022 | Alsberg | ||||||
4 | RF kicks | Alsberg | |||||||
4 | Linac BBA (rechecks) | BBA Shift Plan | Loney | BBA GUI | |||||
3 | Toroid ringing investigation | Sep 1, 2022 | Alsberg | ||||||
4 | Injector RF Standby triggering | Loney | |||||||
2 | Automated Steering development | White/all | good R measurements and ability to implement those into steering app | ||||||
2 | L1 orbit stability study | Oct 6, 2022 | Parker | ||||||
2 | RF stability (jitter, jumps, and djrift) | Sep 15, 2022 | Ripman | ||||||
3 | PCAV 0 commissioning | 2 | Loney | Thing works | |||||
2 | TCAV3 commissioning | 2 | Thing works | ||||||
2 | DC magnet stability | Sep 29, 2022 | Parker | ||||||
2 | TCAV0 study (sigz v. Sch. phase, etc.) | Oct 6, 2022 TCAV0 Shift Plan | Parker | Done? | |||||
1 | Linac wakefield bump tuning exploration | Yocky | |||||||
1 | Laser heater TTO | ||||||||
Software development/testing |
...