Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Remove MO tower and YAG from the IP
  • Remove ND filters / attenuator
  • Remove glass window between compressor and picnicbasket?!
  • Compensate timing for the change in effective path length
  • long timing scan 10ps window around t0, 10fs steps, 5 per step (5000 shots ~< 10 minutes); GAMMA1 + LFOV + COMP_NEAR + PB_NEAR
    find new t0
  • 2D horizontal vs. time scan 100fs window around t0, 3fs steps (i.e., 30 settings) vs. 100 micron around maximum overlap, 3 micron steps (i.e., 30 settings), 5 shots per setting: 4500 shots (~< 10 minutes)
    find new t0 vs. horizontal0 (position/time of best overlap / strongest non-linear signal)
  • 1D vertical scan (scan ~100 micron in 0.1 micron steps, 5 shots per step → 5000 shots (~< 10 minutes)
    find best vertical position
    change spectrometer setting such that the nonlinear signal can be seen clearly
  • repeat 2D horizontal vs. time scan with LFOV_LBG

Electron-spectrometer calibration

  • Do a calibration scan whenever something is changed (either beam properties or magnet settings)