  • But, to map this out, you need to change the 'polarity' of the stage and potentially add offsets, which is a pain if we don't keep a good log of these values, so these days, we just don't care what is X or Z. Y is definitely vertical though. I hope we can fix the X/Z part once the cable management project is further along.


Task: add motor information to questionnaire:

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-4030
.


StageIOCPVCablingParameter Manager ConfigStatus

Talbot Y: Micos PLS-85 #1

ioc-mec-usrppl-ims

MEC:USR:MMS:25

HDB 15 to PR60 patch panel

CA-261-805-23-C00


MEC/PLS-85 In-Air

Operational. Check directions. 

Talbot X: Newport UTS100PP

ioc-mec-ppl-xps3MEC:PPL:MMN:24

Direct in-air cabling.

Newport

Operational. Check directions. 

Talbot Z: Newport UTS100PP

ioc-mec-ppl-xps3

MEC:PPL:MMN:23

Direct in-air cabling.


Newport

Operational. Check directions. 

East Lens GHIJ: XYZ

ioc-mec-ppl-xps3

MEC:PPL:MMN:[17-19]

Using XPS3 #1-#3 cables, Flange B *1 - *3.

Newport

Operational.

17: -SW +NE

18: -UP +DOWN

19: Check directions.  Eric's advice worked: Kill then Re-init/Home.

To do: 

  • secure vacuum side connections with cable ties

West Lens ABEF: XYZ

ioc-mec-ppl-xps3

MEC:PPL:MMN:[20-22]

Using XPS3 #4-#6 cables, Flange B *4 - *6.

Newport

Operational.

20: -S +N

21: -UP +DOWN

22: -W +E

To do: 

  • secure vacuum side connections with cable ties

VISAR Lens: XYZ

ioc-mec-ppl-xps2

MEC:PPL:MMN:[09-11]

XPS2 #1-#3 cables come into bottom SW flange.Newport

Operational.

9: -N +S

10: -UP +DOWN

11: -E +W

JJ Slit: X

ioc-mec-tc1-vt21hv-ims

MEC:TC1:MMS:[17,18]

We are using a mirror reversed pin-out of cable CA-261-802-71-C01 "JJ X-RAY AT-C8-HV SLITS".

Routing is R64B to North side of target chamber via overhead cable trays.

This air-side cable is 2 x DB15S (on JJ Slit side, each DB15S carries offset/gap commands and limit switch readbacks) to 4 x TT19PP).

A new drawing and CAPTAR tags need to created.

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-3901

XPP/JJXGap00

XPP/JJXOff00

Running without limit switches. Need to diagnose and correct.  Also

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-3901

17: -N +S

18: -OPEN +CLOSE

JJ Slit: Y

ioc-mec-tc1-fwheels-ims

MEC:TC1:MMS:[01,02]

XPP/JJXGap00

XPP/JJXOff00

Running without limit switches. Need to diagnose and correct. Also

Jira
serverSLAC National Accelerator Laboratory
serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
keyECS-3901

01: -DOWN + UP

02: -OPEN +CLOSE

...