...
Stage | IOC | PV | Cabling | Parameter Manager Config | Status | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Talbot Y: Micos PLS-85 #1 | ioc-mec-usrppl-ims | MEC:USR:MMS:25 | HDB 15 to PR60 patch panel CA-261-805-23-C00 | MEC/PLS-85 In-Air | Operational. Check directions. | ||||||||||||||||
Talbot X: Newport UTS100PP | ioc-mec-ppl-xps3 | MEC:PPL:MMN:24 | Direct in-air cabling. | Newport | Operational. Check directions. | ||||||||||||||||
Talbot Z: Newport UTS100PP | ioc-mec-ppl-xps3 | MEC:PPL:MMN:23 | Direct in-air cabling. | Newport | Operational. Check directions. | ||||||||||||||||
East Lens GHIJ: XYZ | ioc-mec-ppl-xps3 | MEC:PPL:MMN:[17-19] | Using XPS3 #1-#3 cables, Flange B *1 - *3. | Newport | Operational. 17: -SW +NE 18: -UP +DOWN 19: Check directions. Eric's advice worked: Kill then Re-init/Home. To do:
| ||||||||||||||||
West Lens ABEF: XYZ | ioc-mec-ppl-xps3 | MEC:PPL:MMN:[20-22] | Using XPS3 #4-#6 cables, Flange B *4 - *6. | Newport | Operational. 20: -S +N 21: -UP +DOWN 22: -W +E To do:
| ||||||||||||||||
VISAR Lens: XYZ | ioc-mec-ppl-xps2 | MEC:PPL:MMN:[09-11] | XPS2 #1-#3 cables come into bottom SW flange. | Newport | Operational. 9: -N +S 10: -UP +DOWN 11: -E +W | ||||||||||||||||
JJ Slit: X | ioc-mec-tc1-vt21hv-ims | MEC:TC1:MMS:[17,18] | We are using a mirror reversed pin-out of cable CA-261-802-71-C01 "JJ X-RAY AT-C8-HV SLITS". Routing is R64B to North side of target chamber via overhead cable trays. This air-side cable is 2 x DB15S (on JJ Slit side, each DB15S carries offset/gap commands and limit switch readbacks) to 4 x TT19PP). A new drawing and CAPTAR tags need to created. | XPP/JJXGap00 XPP/JJXOff00 | Running without limit switches. Need to diagnose and correct. Also 17: -N +S 18: -OPEN +CLOSE | ||||||||||||||||
JJ Slit: Y | ioc-mec-tc1-fwheels-ims | MEC:TC1:MMS:[01,02] | XPP/JJXGap00 XPP/JJXOff00 | Running without limit switches. Need to diagnose and correct. Also 01: -DOWN + UP 02: -OPEN +CLOSE |
...