...
Stage | IOC | PV | Cabling | Parameter Manager Config | Status | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Talbot Y: Micos PLS-85 #1 | ioc-mec-usrppl-ims | MEC:USR:MMS:25 | HDB 15 to PR60 patch panel CA-261-805-23-C00 | MEC/PLS-85 In-Air | Connected and referencedOperational. | |||||||||||
Talbot : Micos PLS-85 #2X: Newport UTS100PP | ioc-mec-usrpplppl-imsxps3 | MEC:USRPPL:MMSMMN:TBD | HDB 15 to PR60 patch panel CA-261-805-23-C00 - See | MEC/PLS-85 In-Air | 24 | Direct in-air cabling. | Newport | Operational. | ||||||||
Talbot Z: Newport UTS100PPTalbot: Newport TBD | ioc-mec-ppl-xps3 | MEC:PPL:MMN:23 | It is DB15 (not DB25) on stage side. Direct in-air cabling. | Newport | Connected and homed. Check directions (Z stage). | Operational | ||||||||||
East Lens GHIJ: XYZ | ioc-mec-ppl-xps3 | MEC:PPL:MMN:[17-19] | Using XPS3 #1-#3 cables, Flange B *1 - *3. | Newport | Connected and referencedOperational. 17: -SW +NE 18: -UP +DOWN 19: Check directions. Eric's advice worked: Kill then Re-init/Home. To do:
| |||||||||||
West Lens ABEF: XYZ | ioc-mec-ppl-xps3 | MEC:PPL:MMN:[20-22] | Using XPS3 #4-#6 cables, Flange B *4 - *6. | Newport | Connected and referencedOperational. 20: -S +N 21: -UP +DOWN 22: -W +E To do:
| |||||||||||
VISAR Lens: XYZ | ioc-mec-ppl-xps2 | MEC:PPL:MMN:[09-11] | XPS2 #1-#3 cables come into bottom SW flange. | Newport | Operational. 9: -N +S 10: -UP +DOWN 11: -E +W |
...
Detector | DAQ Host | DAQ Configuration | Cabling | Status | |
---|---|---|---|---|---|
Epix10kaQuad0 | daq-mec-pgp02 | -i 0 -P 0x10 -R 0 -D 0x1760 | Unchanged since L-10075. | OKOperational. | |
Epix10kaQuad1 | daq-mec-pgp02 | -i 1 -P 0x20 -R 0 -D 0x1760 | Unchanged since L-10075. | OKOperational. | |
Epix10kaQuad2 | daq-mec-pgp02 | -i 2 -P 0x11 -R 0 -D 0x1760 | Unchanged since L-10075. | OKOperational. | |
Epix10kaQuad3 | daq-mec-pgp02 | -i 3 -P 0x21 -R 0 -D 0x1760 | Unchanged since L-10075. | OKOperational. | |
Zyla |
daq-mec-cam01 | -c 0 -i "MecTargetChamber/0/Zyla/0" | Triggering issues. | USB - fiber | OperationalZyla is on and runs (untriggered only right now) using zylaStandAlone. |
Alvium | daq-mec-pgp01 | -s 036T9 -l 400000000 | TBD Will be in target chamber (air only) for spatial overlap measurement. (one day max). Vincent has cables available. | ||
Visar1 | daq-mec-misc01 | -i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:01 -B IMAGE1 -n 64 -z 2818048 -f 1 -r | Unchanged since L-10075. | OKOperational. | |
Visar2 | daq-mec-misc01 | -i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:02 -B IMAGE1 -n 64 -z 2818048 -f 1 -r | Unchanged since L-10075. | OK | XTCAVOperational. |
DAQ/AMI-2
Device | ||
---|---|---|
XTCAV | ||