Task | Description | Status | Owner | ||
---|---|---|---|---|---|
top level structure | Create top level | Done |
| Dionisio | |
Add devices ASIC control and trigger | Copy from epix-hr-single-10k, add new addresses | Done |
| Dawood | |
Viewer | Discuss with Ben to find out if we should use the new ePix viewr | Dawood/BenFixed several issues with the viewer, and was able to get images. The image size however is still not accurate. Need to investigate | |||
Test setup
Task | Description | Status | Owner |
---|---|---|---|
FW/SW data verification | Fake data generation and display | ||
Check waveforms in HW | Using TTL outputs | ||
Check SACI waveforms | Using analog test points | ||
Check power enable | Using test points or analog board | ||
Check timing receiver | Use timing board from Matt | ||
...