  1. Verify vacuum conditions in the IP of approximately 1e-6 Torr.
  2. Verify both US-DPS and DS-DPS pumps are running and operating as normal.  Also check VPIO:LI20:3164 to ensure the ion pump is on.
    1. This is how the DPS looks under nominal operation:
    2. image2022-7-29_16-16-2.png
  3. Start a strip tool and load the file: DPS_Gasjet_Pressures.stp
    1. Find the VGCM:LI20:M3203:PMONRAW pressure - this is the 10 Torr capacitance manometer gauge that will provide the IP pressure.
  4. Verify the oven fill line is connected to the gas bottle of the desired gas type and the flow regulator is closed.
    1. Gas bottles and flow regulator location:
  5. Set up to the mass flow controller: How to use MKS mass flow controller (DPS)
  6. Open the fill valve #1 to evacuate the line and leave open for several minutes then close. 
  7. Open the gas bottle and set the regulator to 10 psig.
  8. Read the gas bottle pressure and ensure that there is enough gas to last for the intended fill.
    1. Previous measured rate of He usage at 5 Torr IP pressure = 165 psi/day (one full 2500 psi bottle drained in ~15 days)
  9. Verify gas bottle on fill line #2 is closed and that the fill valve for this line is closed. Ensure that the IOTA controller in FKG20-24 is turned OFF.
  10. Open the fill valve #1 and set start flow rate on the flow regulator to 0.1 SCFH with the MFC to purge He through the fill line for several minutes.
  11. Close the fill valve to stop the flow and evacuate the IP again.
  12. If operating the Li oven, follow the E300 procedure to prepare the Li oven for a static fill.

...

  1. Close angle valve VV3202 isolating the plasma beamline from the plasma turbo
  2. Close valve FV-PB on the foreline of the Picnic Basket. Turn off Picnic Basket turbo
  3. Close Beryllium window valve VV3208
  4. Adjust the flow regulator MFC to reach the desired fill pressure. There is a slow so make changes slowly.
    1. In previous tests a setting of ~0.8 SCFH or ~400 on MFC results ~5 Torr for He
  5. It will likely take 5-10 minutes for the pressure to approach the pressure setpoint. Make small changes and wait for 5-10 minutes for the pressure to stabilize before proceeding with more adjustments.
  6. Continue to monitor the IP pressure and make minor adjustments to the flow rate if necessary.

...