  • HP compressed: in this configuration, the main beam passes through the entire MPA, the telescope, and the compressor. Nothing is bypassed. The full energy is 1.5J after MPA2, 1J on the target, 40 fs pulse duration, and 1e19 W/cm2 intensity. In this case, the time tool configuration setup should be full-length as shown in Fig. 2 (a).

    1. First, on the 2nd floor (Fig. 2 a), check and align the beam passes

    (1)
    1. all the bounce mirrors

    ,
    1. (

    2)
    1. 1), use in and out irises to check the time tool compressor(

    3)
    1. 2), and use the irises to check the manual delay. Check and move the stage to the position marked by yellow "HP compressed".

    2. On the 1st floor (Fig. 2

    (
    1. b),

    on the 1st floor,
    1. check camera TT out and use the T2 mirror on the 2nd floor to adjust.

     
    1. Use the T3 mirror to point the beam to the output iris. Check and move the delay stage to the position marked by yellow " HP compressed"

    .
    1. (Fig. 2

    (
    1. c)

    )
    1. .

    2. The beam should be on time tool GigE cam already. Use T3 mirror to adjust the beam on time tool GigE cam.
    3. To check pulse duration, flip in the 1" mirror to send the beam into Spider. (Fig 2

    (
    1. d)

    )
    1. How to operate Spider

      Image Modified

      Image Added

    Image Removed
    1. Image Added

      Image Modified

      Figure 2

...

    1. (a)

...

    1. On the 2nd floor, the beam passes

...

    1. all the bounce mirrors

...

    1. (

...

    1. 1), time tool compressor (

...

    1. 2)

...

    1. , and manual delay (3).

...

    1. Use the

...

    1. T2 mirror to

...

    1. adjust the beam to center on TT out imager.Figure 2 (b)

...

    1. On the 1st floor,

...

    1. adjust T2 mirror to center the beam on TT out imager. This can be easily done by IR card too. Use the T3 mirror to point the beam to the output iris. The beam should be on time tool GigE cam already.Figure 2 (c) Check and move the delay stage to the position marked by yellow " HP compressed"

...

    1. Figure 2 (d) To check pulse duration, flip in the 1" mirror to send the beam into Spider. 
  • LP bypass MPA2: in this configuration, the main beam bypass MPA2, the telescope. The compressor is not bypassed. the full energy is about 10mJ  before the compressor, 5mJ on target. 40fs pulse duration and 5e16 W/cm2 intensity.

...


Alignment check