Use this guide to trouble shoot faults with the DPS: DPS Pump Troubleshooting


Test results: DPS Stability and Failure Modes

Summary of 3 day test of stability with the manual flow control, and reaction of the IP pressure levels to various DPS failure modes.

dstorey - 2022-12-14 - DPS Stability and Failure Mode Tests.pdf



Info
  • The DPS watcher should behave normally under a static fill of the IP.
  • If filling with hydrogen gas then the purge gas should be used on stages 1 and 2. If you don't, the foreline pressure will build up slowly and eventually impact beamline pressures.
    1. Open the valve on the 6 pack and ensure regulator reads about 10 psig
    2. Open the purge gas valves on US1 and DS1 - Channels 1 and 2 on Beckhoff controller "N".
    3. Be sure to stop the purge gas and close the valves when finished.

...