  1. Verify vacuum conditions in the IP of approximately 1e-6 Torr.
  2. Verify both US-DPS and DS-DPS pumps are running and operating as normal.  Also check VPIO:LI20:3164 to ensure the ion pump is on.
    1. This is how the DPS looks under nominal operation:
    2. image2022-7-29_16-16-2.png
  3. Start a strip tool and load the file: DPS_Gasjet_Pressures.stp
    1. Find the VGCM:LI20:M3203:PMONRAW pressure - this is the 10 Torr capacitance manometer gauge that will provide the IP pressure.
  4. Verify the oven fill line is connected to the gas bottle of the desired gas type and the flow regulator is closed.
    1. Gas bottles and flow regulator location:
    2. Image Added
  5. Open the fill valve #1 to evacuate the line and leave open for several minutes then close. 
  6. Open the gas bottle and set the regulator to 10 psig.
  7. Read the gas bottle pressure and ensure that there is enough gas to last for the intended fill.
    1. Previous measured rate of He usage at 5 Torr IP pressure = 165 psi/day (one full 2500 psi bottle drained in ~15 days)
  8. Verify gas bottle on fill line #2 is closed and that the fill valve for this line is closed.
  9. Open the fill valve #1 and set flow rate on the flow regulator to 0.1 SCFH to purge He through the fill line for several minutes.
  10. Close the fill valve to stop the flow and evacuate the IP again.
  11. If operating the Li oven, follow the E300 procedure to prepare the Li oven for a static fill.

...