...
2022_DEC_15_pamm_eos_e320_timing_measurement.pdf
Analysis of the scope traces
- PROBE delay at 76 mm
- Main laser arrives at 3.983 (trace 7, left), 3.995 ns (trace 8, right) → 3.989 ns
- Time difference: 705 ps (trace 7, left), 730 ps (trace 8, right) → 718 ps +/- 20 ps
- blue: Oscilloscope, channel 2
- yellow: derivative (calculated numerically)
- dashed lines: inflection points found by maximizing the derivative
- PROBE delay at -74 mm
- Main laser arrives at 2.977 ns (trace 9, left) 2.983 ns (trace 10, right) → 2.980 ns
...