Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

2022 RP attenuator (currently installed)

RP attenuator delay:

From

...

shift

...

on

...

06/16/2022
EOS

...

signal

...

to

...

e-beam

...

with

...

laser

...

on:

...

1256.0620

...

ns

From

...

shift

...

on

...

06/17/2022
EOS

...

signal

...

to

...

e-beam

...

with

...

laser

...

on:

...

1256.5190

...

ns

The

...

RP-attenuator

...

adds

...

~

...

457

...

(+-

...

2)

...

ps

...

or

...

137

...

mm

...

(+-

...

0.6)

...

to

...

the

...

laser

...

path.

...



Description:

4 mirrors and s-pol as input (one wave plate needs to be removed).

...