- Removed (partially) the HV/LV patch panel in PR62 and the associated and unused Weiner power supply found in rack R64B. The latter has EEIP approval.
Item description | Location | Person who entered the entry | ServiceNow ticket link | Completed? | Comments | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
JJ slits | Optical Table in the hutch | LCLS0003627 | Work assigned to Brian Smith. The controller is now back at XPP (9 June 2022) and a comment indicated as such added to the ServiceNow ticket. | ||||||||
Missing EEIP stickers (4 copies of #3532) | edrive?1 edrive?2 | Peregrine McGehee | Peregrine to create ServiceNow ticket. | ||||||||
Replace peeling EEIP sticker (1 copy of #1152) | S65 | Peregrine McGehee | Peregrine to create ServiceNow ticket. | ||||||||
CXI Controller | PR63, Back, E8/E9 | Peregrine McGehee | PR63 was inherited from CXI. | HV/LV Supply B999-PR62-PPL-06 261-510-53-00 | PR62, E6/E7 | Note from Eric Cunningham: I'm fairly certain there's nothing plugged into it, and I think it's sourced from a supply in rack 64B that also has nothing plugged into it. It would be a great candidate for removal -- free up space in both racks (PR62 and 64B)! We will examine this during the 10 June 2022 10:00 cable session. | MEZZ | Peregrine to inspect MEZZ Racks on 10 June 2022. |