...
Item description | Location | Person who entered the entry | ServiceNow ticket link | Completed? | Comments |
---|---|---|---|---|---|
JJ slits | Optical Table in the hutch | LCLS0003627 | Work assigned to Brian Smith. The controller will be going back to FEE today(?) as they need it for Tuesday 14 June.is now back at XPP (9 June 2022) and a comment indicated as such added to the ServiceNow ticket. | ||
Missing EEIP stickers (4 copies of #3532) | edrive?1 edrive?2 | Peregrine McGehee | Peregrine to create ServiceNow ticket. | ||
Replace peeling EEIP sticker (1 copy of #1152) | S65 | Peregrine McGehee | Peregrine to create ServiceNow ticket. | ||
CXI Controller | PR63, Back, E8/E9 | Peregrine McGehee | PR63 was inherited from CXI. | ||
HV/LV Supply B999-PR62-PPL-06 261-510-53-00 | PR62, E6/E7 | Note from Eric Cunningham: I'm fairly certain there's nothing plugged into it, and I think it's sourced from a supply in rack 64B that also has nothing plugged into it. It would be a great candidate for removal -- free up space in both racks (PR62 and 64B)! We will examine this during the 10 June 2022 10:00 cable session. | |||
MEZZ | Peregrine to inspect MEZZ Racks on 10 June 2022. | ||||