- need burst mode (no beam outside integration window)
- daq needs to think about timestamping requirements in burst mode
- longer integration requires better cooling (Chris K. suggests limit of 400us integration? maybe 800us? Angelo thinks above >100us for epixM could be problematic, but needs testing)
- different running modes require different calibrations (pedestals, gains, offsets)
- need to have set of standardized conditions to choose from (requires psana support)
- Needed May 2023
- Need to know if epixM needs better cooling (there are limits to what can be done)
- Action item: test longer integration times for epixHR and epixM (400us or 800us). (2 weeks?)
- Action item: Andy/Georgi provide a few use-cases
- Action item: Detector group produces a list of examples that "make sense" e.g. frame rate vs. deadtime and noise issues
- Needed May 2023
- Need to know if epixM needs better cooling (there are limits to what can be done)Action item: DAQ/analysis group figure out timestamping requirements in burst mode