Search/Navigation:
Related:
SLAC/EPP
/HPS Public
Jefferson Lab/Hall B
/HPS Run Wiki
S30XL-LESA/LDMX
...
Load the configuration for the system configuration (back end: ATCA (advanced telecommunication computing architecture) and front end (FEB+Hybrid+APVs)) . Click on the HpsSvtDaqRoot tab and load settings
No Format |
---|
/u1/hps/daq/heavy-photon-daq/software/config/rce-test.yml |
There is a copy of this configuration file in /u1/hps/server/heavy-photon-daq/software/config/
It might be unclear which link channel goes from the RTM to the FEB(s). In the test area, where a single feb is attached to the RTM, one can put in the link map the fill list of RTM channels (12) giving the full list of tuples.
Each index of the list is the feb address of the feb array and in each tuple (X,Y) X is the cob number (0,1) and Y is the link number 0-11.
Example:
Provide
No Format |
---|
[(0,1),(0,2),...]
|
To activate all the links and then check which one reads back to True when reading the variables
In Variables tab navigate to the FebArray→FebCore→FebConfig and HybridPwrEn the 0 and 1 (the power supply will not be able to sustain 3 hybrids, but should be OK for 2).
After turning on the Hybrids, load the configuration again to be sure you are sending the right config to them.
...