sYAG checked out - PROF:LI20:2434. Both motion and light works - controlled on profile monitor panel. The camera is CAMR:LI20:100.

USTHz

USTHz checked out

...

but there is an issue with not having mechanical limit switches. Soft limits need to be used instead and checked before moving. For the short term, best to ask an expert to verify it is set up properly (C. Clarke, J. Allen, S. Gessner). Negative motion is okay when watching with the camera but real caution needs to be used with positive motion. OTRS:LI20:3070. Ladder edm

...

needs to be updated! Camera is CAMR:LI20:106.

...

LED light

...

is not installed but overhead lights were left on. 

USOTR

USOTR checked out - OTRS:LI20:3158. Ladder edm linked to from Profile Monitor panel will work. Camera is CAMR:LI20:101. LED light is set up on the USOTR channel accessible on the profile monitor edm panel.

...

Fully checked out. Left with the bypass line in the beam path. Put posts in the way so it won't move out of alignment accidentally. These will remain until MPS is working which will shut off the beam when oven table is in an intermediate state.

The Bad and the Ugly (aka work in progress)

Toroids

...

Tunnel work complete- toroids are connected to long haul cables. Need to be brought online and calibrated. 

IP Wirescanner 1

Checked out motion controls. PMT3350 and PMT3360 appear offline but are connected to long-hauls and no signs of why there would be issues from the tunnel side. Work still needed here.

IP Wirescanner 3

Checked out motion controls but LVDT is not calibrated. PMT3350 and PMT3360 appear offline but are connected to long-hauls and no signs of why there would be issues from the tunnel side. Work still needed here. 

Note, images of the card can be found here: https://drive.google.com/file/d/1scVopR61fpoo_dhtIH5aFozV2wHd0yiM/view?usp=sharing

IPOTR2 and IPOTR1P

Motion control is all good. Cables are prepared for the cameras. Just don't have cameras on these yet as they are not needed and we don't want to irradiate cameras without reason. IPOTR2 is controlled on OTRS:LI20:3202 and IPOTR1P is on OTRS:LI20:3175. 

Alignment laser injection

Pneumatic actuator works on OTRS:LI20:3158:PNEUMATIC. Needs to have limit switches fixed though. Laser set up has been completed but picomotor controllers are not in EPICS

IP Wirescanner 1

Checked out motion but LVDT needs to be set up. Small question over the controls channel to be resolved. PMT3350 and PMT3360 appear offline. Work still needed here.

IP Wirescanner 3

Not checked out. (Note wirescanner #2 is not installed).

IPOTR2 and IPOTR1P

Motion control is all good. Just don't have cameras on these yet. IPOTR2 is controlled on OTRS:LI20:3202 and IPOTR1P is on OTRS:LI20:3175. Cameras currently not needed.

Alignment laser injection

Pneumatic actuator works on OTRS:LI20:3158:PNEUMATIC. Needs to have limit switches fixed though.