Need | Category | Description | Status | Comments | Volunteer |
---|---|---|---|---|---|
Plans | |||||
Systems Engineering Management Plan (SEMP) | N. Kurita | ||||
Risk Management Plan (RMP) | Drafted and in use | N. Kurita | |||
Design Review Plan | |||||
Configuration Management Plan (technical only?) | |||||
Value Management Plan | |||||
Performance Assurance Plan | |||||
Operations Concept Document | |||||
Standards | |||||
Mechanical Standards | N. Kurita | ||||
Electrical Standards | G. Haller | ||||
Software Standards | G. Haller | ||||
Factors of Safety | N. Kurita | ||||
Environmental Specification | N. Kurita | ||||
Requirements | All | ||||
Must Have | Science Requirements | N. Kurita | |||
Must Have | Measurement/Survey Requirements | N. Kurita | |||
Must Have | System Requirements | N. Kurita | |||
Must Have | LAT Requirements | J. Grudzinsky | |||
Must Have | SAT Requirements | B. BeusnerBesuner | |||
Detector Requirements | G. Haller | ||||
Readout Requirements | G. Haller | ||||
Module Requirements | G. Haller | ||||
DAQ & Controls Requirements | M. Huffer | ||||
Site Requirements | B. Scmidt | ||||
Integration & Test Requirements | |||||
Interfaces | Bobby & Jim | ||||
Block diagrams | |||||
N2 Diagrams | |||||
ICDs Phase 1 | |||||
Technical Maturity | |||||
Other | Alternative Analysis | ||||
Risk Registries | N. Kurita |
...