The Feedback Prototyping project includes several sub-projects. A task list and schedule is (will be...) included for each:
...
- soft IOC simulator to generate data for feedback testing
- add simulation of user controls for LLRF
- add calc of real BPM x-position values, replace virtual energy device for Energy feedbacks
- add calc of real BL11 reading, replace virtual current device for Energy / Bunch length feedback
- as ICDs become available add limits, resolutions, EGU etc to simulator
- Individual Feedbacks
- Bunch Charge
- gotta get going on this soon!
- need ICD for toroid
- need ICD and additional info on inner laser energy loop
- Energy at DL1 / Spectrometer Dump
- LLRF questions - need ICD (including PV names and how they work)
- add control records on LLRF Amp and Phase to lock out users during automated feedback
- need BPM ICD
- need dispersion values for each BPM - they are not in SLC Database, store in config file? Need that oracle database here...
- DL1 Energy + BC1 Energy + Bunch Length
- need to use IM01 to calc Bunch Length values (along with BL11 reading)
- where to get calibration constant C for BL11/ IM01 calcs? See doc from Paul
- need ICDs for toroids and BLEN
- Injector Launch
- test Paul's latest optimization algorithm with latest simulator BPM values and noise levels
- need BPM ICD
- Bunch Charge
...