Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

11:00 RD53a DUT stage slight rotated to get slight charge sharing in "phi". Tape measured distances derived an angle of 11.8o. Reconstructed angle from photo gave 13o  which are consistent with errors.  Image Removed

 

Image ModifiedImage ModifiedImage Added
RD53a DUT position before Nov/6 (perpendicular)RD53a DUT position before Nov/6 (zoom)Nov/6 DUT after rotation


11:50 Beam is back on (earlier than expected!)

...