  • Switch to tilted data taking with the two LBNL RD53a
  • More cosmic telescope data with separate cosmicGui partition 

Activities

9:30 AM Sanha called the beam control room to start the beam. There is a water leakage in the klystrons, and the repair/replacement will take 3-4 hours. Test beam data taking will be postponed until the repair/replacement is complete (probably in the early afternoon).

9:50 AM cosmicRun 051. Testing the current telescope configuration for any random noises. Cyclic trigger set to 100Hz. Almost no random noise is seen after 100s.

11:50 Beam is back on (earlier than expected!)

11:52 Started data taking

12:35 Channel 10 beam trigger disappeared. Reason unknown

13:05 Swapping the trigger channels 10 (originally feeding the EUDET) and 11 (originally feeding the cosmic telescope). The original trigger settings are: width 200ns, delay -110488ns for channel 10 (EUDET) and width 100ns, delay -104500ns for channel 11 (cosmic telescope).

RunStartEnd time#eventsRD53a DUTParticle rateComments
48111:5211:561kC, D RD 53A tilted at 11.8 degrees. Run ended early to change YARR config.
48211:5612:357kC, D4.8 / 0.8The trigger from the machine stopped. Run ended.
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
       
Cosmic RunStartEnd time#eventsTrigger DelayComments
051~9:50~9:511k-104500, 224Testing without the beam for random noises. No significant noise seen.
05311:56 12:2710k-104500, 224 
05412:34 13:059k-Cosmic run ended in order to change the trigger over to the RD 53A's