  • Switch to tilted data taking with the two LBNL RD53a
  • More cosmic telescope data with separate cosmicGui partition 

Activities

9:30 AM Sanha called the beam control room to start the beam. There is a water leakage in the klystrons, and the repair/replacement will take 3-4 hours. Test beam data taking will be postponed until the repair/replacement is complete (probably in the early afternoon).