19:45 Successful data taking resumed for RD53A

20:17 Started cosmicRun 051. LBNL cosmic telescope moved around slightly to better center the beam: current config X stage -3.50mm and Y-stage -83.99mm. cosmicGui trigger delay is also set to 216 now, in order to capture just the first bunch of the beam and avoid the suspected "double-ticking" effects by some bad pixels.

21:01 Ended cosmicRun 051 due to the end of beam time.

 

Data summary:

RunStartEnd time#eventsRD53a DUTParticle rateComments
4609:219:56

10K

C,D4.6 / 1.1Start Day shift with beam setup as yesterday
4619:5610:3010KC,D After this run all connections but the monitor and log collector died and the next run was not autostarted. Saved data from run 461, terminated processes, and restarted.
46310:3211:0610KC,D -
46411:0611:389.5KC,D Stopped a little early to avoid potential event mismatch errors, will continue to do this for the rest of the runs.
46511:3912:129.8KC,D -
46612:1212:4610KC,D Accidentally ran to 10K and autostarted next run (with no issues) because we were looking at the cosmicGui and lost track of the count. Stopping a bit before 10K resumes with 467.
46712:4713:189.5KC,D -
46813:1913:519.5KC,D -
46913:5214:249.8KC,D3.9 / 0.68

-

47014:2514:589.8KC,D -
47115:0115:349.7KC,D -
47216:0316:3610KC,D Started Run 472 after access to ESA to establish trigger for cosmic telescope, decided to let the run control autostart runs again. 
47316:3717:1010KC,D -
47417:1117:4410KC,D -
47517:4518:1810KC,D -
47618:1918:403KC,D Data taking stopped abruptly for both the cosmic telescope and the two RD53A modules. Couldn't ssh into computer downstairs that starts the TLU Producer. Shut off beam and requested access.
47819:4520:2110KC, D Another full 10K run with the same beam setting after accessing due to computer shutdown issues
47920:2120:5510K

C, D

 -
48020:559:011668C, D Run ended due to the end of beam time