InstitutionNames
ANLVallary Bhopatkar
IHEPYubo Han
LBNLAlexandra Dimitrieska, Maurice Garcia-Sciveres, Timon Heim, Charilou Labitan, Ben Nachman, Karol Krizka, Anne-luise Poley, Cesar Gonzalez Renteria, Mark Standke
LouisvilleSwagato Banerjee
SLACNicole Hartman, Ke Li, Jannicke Pearkes, Murtaza Safdari, Su Dong
UCSCJason Nielsen

...

    3pm:  At the entrance of ESA, AD106 ESA orientation training for all new comers still need to take it.

 

Actual activities:

    12:15 First beam with Caladium only. Initial spot more like 5mm diameter with ~30 hit clusters/event. After talking to Toni, opened up the collimator some to ~100 cluster/event and ~1 cm diameter spot, but ~ a few mm off-center. 

    12:30 Ke and Vallary are adjusting the X-Y position of the telescope to make sure the beam is at the center for all telescope planes. We see a reasonable beam spot, with sharp boundaries probably defined by upstream aperture. There is a tilt in the telescope so that the front 3 planes are centered, while the centers of back 3 planes are slightly higher. This was also visible during the Caladium beamline alignment but it was decided to be worth fine tune if really needed as this involves rather cumbersome chipping on one side.

     1:30 Ben is testing eudaq 1.7 with new config files. Cannot get TLU producer up. The issue seems to be that the original V1.5 TLUProducer.exe for the NI crate windows process is not compatible with V1.7. This needs to be rebuilt on an Windows 7 a machine. An old laptop from Su Dong's office is brought over to compile the new version but many utlities to install to start with...