Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

TypeNameRevisionEng. ResponsibleBring Up ProceduresReady for ProductionStill needs to be testedKnown Issue
ATCAAMC CarrierC06Larry R.Documented on confluenceBeing Evaluated
  • Back plane timing
    • Issues with C05 (or earlier) timing distribution
    • Being evaluated for C06 by Matt W.
    • Jira
      serverSLAC National Accelerator Laboratory
      columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
      serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
      keyESLTIMING-11
  • Double check radiated power with new chassis grounding
    • Being evaluated by Mitch
    • Jira
      serverSLAC National Accelerator Laboratory
      columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
      serverId1b8dc293-975d-3f2d-b988-18fd9aec1546
      keyESLCOMMON-154
  • JESD > 10 Gbps for cryo-det application
    • Working on C07 schematics/layout to fix this
ATCATiming FanoutC01Matt W.NoneWaiting for C01 prototype from assembly house  
RTMMPS/TimingC04Larry R.NoneBeing Evaluated
  • Still need to evaluate the MPS digital inputs and digital outputs
 
RTMDigital DebugC03Larry R.NoneIn layout queue  
AMCGeneric ADC/DACC03Larry R.Documented on confluenceBeing Evaluated
  • Sub-group evaluation
    • BCM: Approved
    • BLEN: Approved
    • Cavity Stripline: Still needs to evaluate
 
AMCStripline BPMC04Andrew YDocumentation exists but needs to be posted on board design confluence page???  
AMCMPS Digital InputsC01Ryan H.None???  
AMCMPS SFPC02Ryan H.None???  
AMCTiming Digital I/OC00Matt W.None???