AMC Carrier

    
TypeNameRevisionEng. ResponsibleBring Up ProceduresReady for ProductionStill needs to be testedKnown Issue
ATCAAMC CarrierC06Larry R.Documented on confluenceBeing Evaluated
  • Back plane timing
    • Issues with C05 (or earlier) timing distribution
    • Being evaluated for C06 by Matt W.
  • Double check radiated power with new chassis grounding
    • Being evaluated by Mitch
  • JESD > 10 Gbps for cryo-det application
    • Working on C07 schematics/layout to fix this
ATCATiming FanoutC01Matt W.NoneWaiting for C01 prototype from assembly house  
RTMMPS/TimingC04Larry R.None (who's responsible?)Being Evaluated
  • Still need to evaluate the MPS digital inputs and digital outputs
 
RTMDigital DebugC03Larry R.NoneIn layout queue  
AMCGeneric ADC/DACC03Larry R.Documented on confluenceBeing Evaluated
  • Sub-group evaluation
    • BCM: Approved
    • BLEN: Approved
    • Cavity Stripline: Still needs to evaluate
  
AMCStripline BPMC04Andrew YDocumentation exists but needs to be posted on board design confluence page???    
AMC MPS Digital Inputs C01 Ryan H. None???   
AMC MPS SFP C02 Ryan H. None???       
AMCTiming Digital I/OC00Matt W.None???