Time (Pacific) | Title & Speaker | Duration | Post your talk here |
---|---|---|---|
7:00 am | Project Organization & Overview, R. Dupré (IPNO) | 10' | |
7:10 am | Motherboards, M. Battaglieri (INFN) | 15' | |
7:25 am | Pre-amplifiers, E. Rauly (IPNO) | 15' | |
7:40 am | Light Monitoring System, A. Celentano (INFN) | 20' | |
8:00 am | Mechanics and Thermal System, P.Rosier (IPNO) | 20' | |
8:20 am | New APDs installation, M. Battaglieri (INFN) | 30' | |
8:50 am | Commissioning, Calibration and Interfaces F. X. Girod (JLab) | 15' | |
9:05 | Schedule, Budget & Conclusions, R. Dupré (IPNO) | 20' | |
|
|
|
|
9:30 am | Closed Session (Review Panel only) | 60' |
|
Pre-amps calibration (E.Rauly)
Thermal Enclosure (P.Rosier)
Link to the CLAS12 Forward Tagger TDR http://www.ge.infn.it/~batta/jlab/ft-tdr.2.0.pdf. You will find results of LY measurement with BCTP PbWO-II crystals coupled to PMT and a 10x10 APD at pg 27.
Light Yeld estimate for a ECal crystal (old BTCP PbWO) from the the HPS proposal pag pag. 157, top-left panel . These are the measurements we performed in Genova, with a HPS-like crystal (from CLAS-IC), a LA-APD, and a FT-Cal amplifier. The mean energy deposited in the crystal by cosmics is ~ 15 MeV. The corresponding mean charge collected is ~ 25 pC.The amplifier and APD gain were, respectively, 1800 and 150. Measure was performed at 18 +++ 1 deg. This gives an average LY of : 25 / (1800 * 150 * 1.6E-7 *15) ~ 35 phe / MeV
O.Pogorelko's presentation where where he takes 12 p.e./MeV and multiplies by 3 for "our crystals" and comes up with with "3.6 p.e./MeV at APD". If we assume that 3.6 does not include QA=0.75 of APD, than real p.e./MeV will be 2.7. To many inconsistency. I think we should rely on what we (Andrea) measured.
...
Time (Pacific)
...
Title & Speaker
...
Duration
...
Post your talk here
...
7:00 am
...
Project Organization & Overview, R. Dupré (IPNO)
...
10'
...
.
...
7:10 am
...
Motherboards, M. Battaglieri (INFN)
...
15'
...
...
7:25 am
...
Pre-amplifiers, E. Rauly (IPNO)
...
15'
...
...
7:40 am
...
Light Monitoring System, A. Celentano (INFN)
...
20'
...
...
8:00 am
...
Mechanics and Thermal System, P.Rosier (IPNO)
...
20'
...
...
8:20 am
...
New APDs installation, M. Battaglieri (INFN)
...
30'
...
...
8:50 am
...
Commissioning, Calibration and Interfaces F. X. Girod (JLab)
...
15'
...
...
9:05
...
Schedule, Budget & Conclusions, R. Dupré (IPNO)
...
20'
...
...
...
...
...
...
9:30 am
...
Closed Session (Review Panel only)
...
60'
...
Pre-amps calibration (E.Rauly)
Thermal Enclosure (P.Rosier)
...