  1. Consolidation of the Beamline Schedule (Marco, Stepan)
    1. The current baseline considers the HPS experiment installed inside the alcove downstream the CLAS12 experiment in Hall-B. This decision was taken after consultation with the JLAB management, but after the submission of the proposal in May'13. An addendum to the proposal (here) and an implementation plan (here) were developed to describe the feasibility as well as the impact on the schedule of both experiments. The old schedule as described in the proposal and presented at the DOE Review in July'13 is available V500 (here). A consolidation of the baseline schedule for the beamline  is required to monitor the real impact toward the HPS installation in September'14, as well as the commissioning in October'14. A draft schedule is available V600 (here).
    2.  Plan Plan and Elevation drawings of the Beamline Baseline.
  2. ECAL review preparation (Raphael, Stepan, Marco)
  3. FY13 Budget endgame (Marco)
  4. Around the table, AOB (All)