Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Code Block
------- HPS SVT Start of Shift Checklist --------

Shifter name:

Time and date:

Previous Shifter:

Hall B beamline shifter:

Current run:

SVT module power status (ON/OFF):

Write down lowest and highest values of AVDD, DVDD and V125 currents, incl. module nr:

 [Low Voltage]      [Lowest (mA)]     [Highest (mA)]
 AVDD
 DVDD
 V125



Check high voltage setting for each module:

Check SVT module temperature, write down highest and lowest temperature (FPGA 5 hybrid 1 should be 0):

                 [Hybrid/Module #]
Lowest [C]:
Highest [C]:


Check temperature at the vacuum chambler input and output:

            [Temperature (C)]
Input:
Output:

ECal status (short summary):

Trigger status (short summary):

Pair spectrometer magnet (current and :
         [Current]   [B-field)]
Value:

Accelerator status:

Beam current (nA):

Beam position X,Y (um):

Beam plans for the shift:

SVT plans for the shift:

Notes from previous shifter:

 

...