Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Code Block
------- HPS SVT Start of Shift Checklist --------

Shifter name:

Time and date:

Previous Shifter:

Hall B beamline shifter:

Current run:

SVT module power status (ON/OFF):

Write down lowest and highest values of AVDD, DVDD and V125 currents, incl. module nr:

 Low

...

 

...

Lowest mA

...

 

...

Highest mA

...

AVDD

...

 

...

DVDD

...

 

...

V125

...

 

Code Block
 Voltage      Lowest [mA]     Highest [mA]
 AVDD 
 DVDD 
 V125 



Check high voltage setting for each module:

Check SVT module temperature, write down highest and lowest temperature (FPGA 5 hybrid 1 should be 0):


 Module
Lowest [mA]
Highest [mA]





ECal status (short summary):

Trigger status (short summary):

Pair spectrometer magnet (current and B-field):

Accelerator status:

Beam current (nA):

Beam position X,Y (um):

Beam plans for the shift:

Notes from previous shifter:

 

...