Search/Navigation:
Related:
SLAC/EPP
/HPS Public
Jefferson Lab/Hall B
/HPS Run Wiki
S30XL-LESA/LDMX
...
Code Block |
---|
------- HPS SVT Start of Shift Checklist -------- Shifter name: Time and date: Previous Shifter: Hall B beamline shifter: Current run: SVT module power status (ON/OFF): Write down lowest and highest values of AVDD, DVDD and V125 currents, incl. module nr: ||Low Voltage | |Lowest [mA] | |Highest [mA]|| | AVDD DVDD V125 | | | DVDD | | | V125 | | Check high voltage setting for each module: Check SVT module temperature, write down highest and lowest temperature (FPGA 5 hybrid 1 should be 0): Module Lowest [mA] Highest [mA] ECal status (short summary): Trigger status (short summary): Pair spectrometer magnet (current and B-field): Accelerator status: Beam current (nA): Beam position X,Y (um): Beam plans for the shift: Notes from previous shifter: |
...