Search/Navigation:
Related:
SLAC/EPP
/HPS Public
Jefferson Lab/Hall B
/HPS Run Wiki
S30XL-LESA/LDMX
...
Code Block |
---|
------- HPS SVT Start of Shift Checklist -------- Shifter name: Time and date: Previous Shifter: Hall B beamline shifter: Current run: SVT module power status (ON/OFF): Write down lowest and highest values of AVDD, DVDD and V125 currents, incl. module nr: What is the high voltage value for each module: Check high voltage currentssetting (shouldfor be 0 in GUI)each module: Check SVT module temperature, write down highest and lowest temperature: ECal status: Trigger status: Pair spectrometer magnet (current and B-field): Accelerator status: Beam current (nA): Beam position X,Y (um): Beam plans for the shift: Notes from previous shifter: |
...
Code Block |
---|
------- HPS SVT Hourly Shift Checklist --------
Current run/status:
Time:
SVT module power status (ON/OFF):
Write down lowest and highest values of AVDD, DVDD and V125 currents, incl. module nr:
What is the high voltage value for each module:
Check high voltage currents (should be 0 in GUI):
Check SVT module temperature, write down highest and lowest temperature:
ECal status:
Trigger status:
Pair spectrometer magnet (current and B-field):
Accelerator status:
Beam current (nA):
Beam position X,Y (um):
Beam plans:
Notes/comments:
|
...