Search/Navigation:
Related:
SLAC/EPP
/HPS Public
Jefferson Lab/Hall B
/HPS Run Wiki
S30XL-LESA/LDMX
...
Code Block |
---|
------- HPS SVT Start of Shift Checklist -------- Shifter name: Time and date: Previous Shifter: Hall B beamline shifter: Current run: SVT module power status (ON/OFF): Write down lowest and highest values of AVDD, DVDD, V125 incl. module nr: What is the high voltage value for each module: Check high voltage currents (should be 0 in GUI): Check SVT module temperature, write down highest and lowest temperature: ECal status: Trigger status: Accelerator status: Beam current (nA): Beam width X,Y (um): Beam plans for the shift: Notes from previous shifter: |
In order to obtain the password, talk to an expert!
2. Start the SVT DAQ
Execute the startup script as follows:
Code Block |
---|
> ./startTrackerGui
|
This should open 4 new windows:
trackerFullControl: main GUI that controls the SVT
trackerServer: terminal window showing information regarding the
trackerEpics: shows EPICS information (only temperature for now)
3. Start the JLab DAQ (Coda)
To be filled
Before data can be taken the SVT has to be configured as follows.
Use the trackerFull GUI:
0. Check the status of the power and cooling of the SVT by looking here
1. Hit Hard Reset button, wait about 3s until you see "xxxxx" in the System Status window.
2. Hit Set Default button, wait about 3s until you see "Ready to runxxxxxxx" in the System Status window
3. Hit Load Configuration, this should open up a new window. Select full_tracker.xml and press "Open". Wait ~5s until you see "100/100 APV's synced xxxxxxxxxxx"
4. Hit Soft Reset. Wait ~5s until you see "100/100 APV's synced xxxxxxxxxxx"
To be filled.
To be filled.
In the case where the operation of the power supplies can not be done through EPICS, each power supply can be accessed directly through a terminal. After login into clon10 (see above), the command
Code Block |
---|
> tsconnect hpshv1
|
will bring up the display for the power supply powering the top SVT volume and
Code Block |
---|
> tsconnect hpshv2
|
will bring up the display for the power supply powering the bottom volume. After each of the terminal interfaces come up, hitting N (next) will refresh the window. It will also allow you to navigate between screens
The following table provides a map from a power supply channel # to a physical location on the SVT:
Shifter name:
Time and date:
Next Shifter:
Runs taken:
?Run nr Start Stop Events Beam current Beam width Comments^Half_Module_Assignments-Power_Supply_Assignments.pdf||\