Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Template to cut and paste into logbook

Start of shift template

Code Block

------- HPS SVT Start of Shift Checklist --------

Shifter name:

Time and date:

Previous Shifter:

SVT module low voltage power status:


SVT module low voltage power status:

SVT temperature


Hall B beamline shifter:



Accelerator status:

Beam current (nA):

Beam width X,Y (um):

Beam plans for the shift:



Notes from previous shifter:

 

Shift Taker

Starting the DAQ applications

 1. Start the SVT DAQ

Login into the trackersvt with user name tracker:

Code Block

> ssh tracker@hpstracker

In order to obtain the password, talk to an expert!

...

^Half_Module_Assignments-Power_Supply_Assignments.pdf|\