Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Wednesday, 22 March 2006

Agenda:

  • Status of SLAC/CENIC/ASU/SASS connectivity
    • Schedule for provisioning ASU-SASS local loop
    • Additional H/W needed in the MCR
  • SASS I&T LAN Connectivity
    • System description / justification
    • Purchase of Firewall / switch / modem
    • DMZ/Telco rack configuration
      • one-off vs. MCR-like
      • UPS sizing
  • MCR location after LAT integration to spacecraft bus.

Wednesday, 15 March 2006

Agenda:

  • Status of SLAC/CENIC/ASU/SASS connectivity
    • Schedule for provisioning ASU-SASS local loop
    • Additional H/W needed in the MCR

...