We reviewed a list of hardware known to be coming in 2011. 13 racks are needed to house this equipment. 9 racks have been identified (6 without permanent power), and 5 more water cooled racks are to be built out on the first floor. Though these may have been targeted for the R&D cluster.

Action: We need to supply a projection for 2012 acquisitions (with error bars) by the end of July so that budgets can be assembled to handle the rack load.

...