We will likely pick one or two processes and work through them. We hope to assign the rest to SCSC members for them to develop and present.

Hardware Acquisition Planning

We reviewed a list of hardware known to be coming in 2011. 13 racks are needed to house this equipment. 9 racks have been identified (6 without permanent power), and 5 more water cooled racks are to be built out on the first floor. Though these may have been targeted for the R&D cluster.

We need to supply a projection for 2012 acquisitions (with error bars) by the end of July so that budgets can be assembled to handle the rack load.

Update on Workshop Prep

We have some 93 participants registered at present. The logistics appear to be going well for banner, posters, catering, room setup, name badges etc. Jennifer Huang-Le in ICIO is leading the organisational charge, with Helen Butler (PPA) assisting. No known problems.

Miscellany

The SCRF was approved by the Stanford Board of Trustees last week. 2 more meetings to go, with a ground breaking at the end of 2011 and occupancy in mid to late 2012.

...