Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

< Back to SharePoint LCLS-II Controls Page

LCLS-II CD-2 Devices  (

...

Leads for PDR, Cost, and Schedule efforts are in bold)

Device

Physics  Lead

Software Lead

Hardware Lead

Mechanical Lead

Engineering Support

BPM Stripline

Steve Smith

Sonya Hoobler

Evgeny M.

 

 

BPM Undulator

Joe Frisch

Sonya Hoobler

Andrew Young

 

 

Profile Monitor

Loos

Qing Yang

Dave Brown

 

Vergne Brown

Beam Current Monitor (Toroids?)

Joe Frisch

Arturo Alarcon

Brian Bennett/Dave Brown

 

 

Wire Scanner

PKR/Joe

Shantha Condamoor

Pelham Keahey

Mark Campbell

James Bong

Collimator

 

Shantha Condamoor

Pelham Keahey

 

James Bong

Bunch Compressor - bpm, chicane, 
profile monitor, MC, magnet string,
vacuum

 

Shantha Condamoor

Pelham Keahey

 

James Bong

Laser Heater - laser transport (newports),
chicane, magnets, profile mon, und
magnet,...

 

Zheqiao Geng

Joe Frisch

 

??

Undulator Motion Controls

 

Arturo Alarcon

 

 

James Bong

Vacuum

 

Matt Boyes

Pelham Keahey

 

John O'Neal

Magnets

 

Kristi Luchini

Briant Lam

 

 

Beam Finder Wire (*N/A for LCLSII)?*


 


 

 

BLM (MPS) (Beam Loss Monitor)

Alan Fisher

Matt Boyes

John Dusatko

 

 

BLF (Beam Loss Fiber)

 

Qing Yang

John Dusatko

 


 

 

BLEN (Bunch Length Monitor)

 

Qing Yang/Charlie

Evgeny M.

 

 

Stoppers (Assume PPS)

 

Arturo Alarcon

Kristina Turner

 

 

Temperature Monitoring

 

Sonya Hoobler

N/A

 

Anthony Tilghman

Tune-Up Dump (OTR)

 

Qing Yang


 

Vergne Brown

LLRF (RF?) (Modulators?)

 

Zheqiao Geng

Andrew Young

 

 

T-CAV

 

Zheqiao Geng

Andrew Young

 

 

Drive Laser

 

Zheqiao Geng

Bill White / Sasha

 

 

Computers, Crates, Modules

 

Ernest/Sonya Hoobler


 

Bob Traller?

Racks

 

N/A


 

Mario Ortega / Mike DiSalvo

Long Haul Cables

 

N/A


 

Mike DiSalvo

Facility Controls

 

Ernest Williams

Bill Choate

 

 

...