< Back to SharePoint LCLS-II Controls Page
LCLS-II Devices (System Leads for PDR, Cost, and Schedule efforts are in bold)
Device | Physics Lead | Software Lead | Hardware Lead | Mechanical Lead | Engineering Support | ||
---|---|---|---|---|---|---|---|
BPM Stripline | Steve Smith | Sonya Hoobler | Evgeny M. |
|
| ||
BPM Undulator | Joe Frisch | Sonya Hoobler | Andrew Young |
|
| ||
Profile Monitor | Loos | Qing Yang / Charlie | Dave Brown |
|
| ||
Beam Current Monitor (Toroids?) | Joe Frisch | Arturo Alarcon | Brian Bennett/Dave Brown |
|
| ||
Wire Scanner | PKR/Joe | Shantha Condamoor | Pelham Keahey | Mark Campbell | James Bong | ||
Collimator |
| Shantha Condamoor | Pelham Keahey |
| James Bong | ||
Bunch Compressor |
| Shantha Condamoor | Pelham Keahey |
| James Bong | ||
Laser Heater |
| Zheqiao Geng | Joe Frisch |
|
| ||
Undulator Motion Controls |
| Arturo Alarcon | James Bong |
|
| ||
Vacuum |
| Matt Boyes | Pelham Keahey |
| John O'Neal | ||
Magnets |
| Kristi Luchini | Briant Lam |
|
| ||
Beam Finder Wire? | N/A for LCLSII |
|
|
| |||
BLM (MPS) (Beam Loss Monitor) | Alan Fisher | Matt Boyes | John Dusatko |
|
| ||
BLF (Beam Loss Fiber) |
| Qing Yang | John Dusatko |
|
|
| |
BLEN (Bunch Length Monitor) |
| Qing Yang/Charlie | Evgeny M. |
|
| ||
Stoppers (Assume PPS) |
| Arturo Alarcon | Kristina Turner |
|
| ||
Temperature Monitoring |
| Sonya Hoobler | N/A |
| Anthony Tilghman | ||
Tune-Up Dump (OTR) |
| Qing Yang / Charlie |
| Vergne Brown | |||
LLRF (RF?) (Modulators?) |
| Kukhee Kim/ Zheqiao Geng | Andrew Young |
|
| ||
T-CAV |
| Kukhee Kim/ Zheqiao Geng | Andrew Young |
|
| ||
Drive Laser |
| Zheqiao Geng | Bill White / Sasha |
|
| ||
Computers, Crates, Modules |
| Jingchen Zhou/Sonya Hoobler |
| Bob Traller | |||
Racks |
| N/A |
| Mario Ortega / Mike DiSalvo | |||
Long Haul Cables |
| N/A |
| Mike DiSalvo | |||
Facility Controls |
| Susie Zheng/Matt Boyes | Bill Choate |
|
|
...