The production table can be found HERE.
Below is the pre-production table.
Serial Number | Date Shipped | Stave | Type | Length | AXON | DCS | L Potting | L AXON | L Data | Comments |
---|---|---|---|---|---|---|---|---|---|---|
Pre-Production | ||||||||||
IBL-TypeI-01 | April 2013 |
|
| n/a |
| n/a |
|
|
| Electrical cable |
IBL-TypeI-02 | 01 June 2013 |
|
| Long |
| Humidity |
|
|
| Pre-production at CERN, substitute power connector |
IBL-TypeI-03 | 15 June 2013 |
|
| Long |
| Humidity |
|
|
| Pre-production at CERN, substitute power connector |
IBL-TypeI-04 | 30 June 2013 |
|
| Long |
| Humidity |
|
|
| Pre-production at CERN, substitute power connector |
IBL-TypeI-05 | 23 July 2013 |
|
| Long |
| Humidity |
|
|
| Pre-production , substitute power connector |
IBL-TypeI-06 | 19 August 2013 | 05 | 02 | Long |
| Humidity | 2460 | 3487 | 4960 | Bad AXON Connector. |
IBL-TypeI-07 | 10 Oct. 2013 | 05 | 02 | Long | 003 | Humidity | 2458 | 3483 | 4946 | AWG22 Wires for LV. |