h1. February 10 2006
Meeting held at 10am in SLAC Kavli and VRVS Geminga rooms
h2. Agenda
* DC2 Preparation (all needs to be ready and tested by March 1)
** Still waiting for fixed "sky model"
** Dan working on creating merged merit tuples with existing data
*** Problems with NFS causing delays
** To Do
*** Prune merged merit tuples (Tony)
*** Convert pruned tuples to FITS files (?)
*** Set up catalog of DC2 data in data catalog (Tony)
*** Upgrade data server peeler/pruner to pre-filter data files by run (Igor)
*** Upgrade peeler/pruner to work with data catalog (Tony+Igor)
*** Produce utility for converting Run->File with data catalog (Tony)
*** Load FITS files into Jean-Paul dataserver (Tony)
*** Webstart version of WIRED able to access gleam vis SSH (Mark)
*** Interface WIRED to data catalog (Mark+Tony)
* Upgrade to new confluence/jira
** Plan to upgrade sunday evening
*** New version of JIRA (3.4.3), Confluence (2.1.2)
*** Will force SSL connection (automatic redirect from old non-SSL connections)
*** Tomcat moved to glastlnx08, MySQL moved to glastlnx01