Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Table 1.10

Area

Physical Location

Access Buildings

ACR0

Accelerator Control Room (B052)

B005

Building 5

B24

Building 24  (development)

B25

Building 25  (development)

B34

Building 34  (development)

B44

Building 44 - Klystron Test Lab

B81

Building 81 - MMF 

B106

Building 106

B106

Building 136

B911

Building 911

B911

Building 911

B911

Building 911

B921

Building 921

ASTA-UED Facility Area

AS01

Accelerator Structure Test System

Injector Machine Areas

LR20

LCLS Laser Room (Upstairs, near sector 20)

LA20

FACET Laser Room (Upstairs, near Sector 20)

IN20

Injector

LINAC Areas

LI00

LINAC Sector 0

LI20

LINAC Sector 20

LI21

LINAC Sector 21

LI22

LINAC Sector 22

LI23

LINAC Sector 23

LI24

LINAC Sector 24

LI25

LINAC Sector 25

LI26

LINAC Sector 26

LI27

LINAC Sector 27

LI28

LINAC Sector 28

LI29

LINAC Sector 29

LI30

LINAC Sector 30

Beam Switch Yard

For the entire beam switch yard area spanning from the wooden door to the Muon Shield, the device

positions shall range from 100-999, consistently across all beam lines, such that the unit numbers

 match up in Z-position across all beam lines.

MCC0

Main Control Center (B005) OBSOLETE. Replaced with ACR0

CTLHCLTH

Copper LINAC to Hard Line

CTLSCLTS

Copper LINAC to Soft Line

BSYH

Beam Switch Yard Hard Line

BSYS

Beam Switch Yard Soft Line

BSYA

Beam Switch Yard A-Line

SLTH

Superconducting LINAC to Hard Line

SLTS

Superconducting LINAC to Soft Line

SLTD

Superconducting LINAC to Dump Line

BSYS

Beam Switch Yard South Arc

LINAC to Undulator Machine Areas

LTU0

LINAC-to Undulator directly after BSY

LTU1

LINAC-to-Undulator Line 1

Undulator

UND1

Undulator on Line 1

Dump

DMP1

Beam Dump on Line 1

Photon Areas

FEE1

Front End Enclosure on Line 1

NEH1

Near Experimental Hall on Line 1

XRT1

X-Ray Tunnel on Line 1

FEH1

Far Experimental Hall on Line 1

XTA Facility Area

XT01

X-Band Test Area

Global Areas 

SYS0

LCLS-I System

SYS1

FACET System

SYS2

LCLS-II System

SYS3

LCLS-III System

SYS4

NLCTA System

SYS5

SPEAR Systems

SYS6

X-Band Test Area

SYS7

ASTA Test Area

SYS8

 Klystron Test Lab (B44)

SYSW

Global System West

SYSE

Global System East

GBL0

Global to all Machines

...

For the S20-30 linac upgrade, some CAMAC modules (which have fixed slot location) have been give the Position <cratenumber><2-digit slot number>. For example, crate 1 slot 2 would have a Position value of 102.

For the entire beam switch yard area, spanning from the wooden door to the Muon Shield, the device positions shall range from 100-999, consistently across all beam lines, such that the unit numbers match up in Z-position across all beam lines.

 

Table 1.12

Database Name Subsystem Prefix

Display and Database File Name Subsystem Prefix

Subsystem

CD

 

Controls Department, for development only!!

LS

lasr

Laser Steering

PM

prof

Profile Monitor

IM

curr

Current Monitor

BL

blen

Bunch Length Monitor

BP

bpm

Beam Position Monitor

MC

mc

Motion Control

CL

coll

Collimator

CV

CAMAC-to-VME

AM

am

Alignment Mirror

MG

mgnt

Magnet

EV

evg or evr

Event (Timing) System

FC

rf/energy

Frequency Counter/Flip Coil

RF

rf

Low-Level RF Master

RP

rf

Low-Level RF PLL

RC

rf

Low-Level RF PAC

RD

rf

Low-Level RF PAD

MP

mps

Machine Protection System

NW

ntwk

Network Device, terminal servers, switches routers, scopes, function generators, ...

PP

pps

Personnel Protection System

BC

bcs

Beam Containment System

SP

 

Shared platform

TM

temp

Temperature Monitor

TR

toro

Toroid

TZ

thz

TeraHertz System

VA

vac

Vacuum

WA

wat

Water and HVAC

WS

ws

Wire Scanner

FB

fbck

Feedback

AD

ads

Alignment Diagnostic System (Wire Position Monitors + Hydrostatic Leveling Sensors)

KY

klys

Klystron (Solenoid PS, Modulator PS, PIOP )

EX

ex

Experimental Support.

...